Platform
shoes

Platform

Shopify theme by Hex Switch Studios

Haven pairs bold, full-width imagery with dynamic typography for home and lifestyle stores handling mid-to-large catalogs. Shoppable image hotspots for outfit- and room-style product tagging sit alongside before/after sliders, a mega menu with swatch filters, and a sticky slide-out cart, making it a visually driven Shopify theme.
Source Shopify Theme Store Official
★★★★★
★★★★★
5.0 · 8 reviews · 100% positive
PRICE
$ 260,00 USD
PRESETS
4 styles

Independently reviewed by the eDIY editorial team

How fast is Platform?

Google PageSpeed Insights scores for the home page, out of 100

Tested in October 2026, the official Platform demo scored 76/100 on mobile and 98/100 on desktop. On mobile, LCP was 5.8s, CLS 0.00 and Total Blocking Time 52ms.

Theme demo store

Official Platform demo, home page
76 /100
Mobile
Needs improvement
98 /100
Desktop
Good

Tested Oct 2026 · Google PageSpeed Insights lab data

MetricMobileDesktop
Largest Contentful Paint 5.8s 1.1s
Cumulative Layout Shift 0.00 0.00
Total Blocking Time 52ms 19ms
Speed Index 2.9s 1.1s

The 8 live stores we tested averaged 59/100 on mobile and 78/100 on desktop. Average mobile LCP was 11.0s and CLS was 0.01. These are complete production stores, so the numbers cover more than the theme itself.

Live stores average

Mean across 8 stores running Platform
59 /100
Mobile
Needs improvement
78 /100
Desktop
Needs improvement

Tested Oct 2026 · Results include each store's apps, images, tracking scripts and customizations

MetricMobileDesktop
Largest Contentful Paint 11.0s 1.5s
Cumulative Layout Shift 0.01 0.01
Total Blocking Time 361ms 665ms
Speed Index 6.2s 1.8s

Per-store results

8 live stores · tested Oct 2026
legriddleus.com
legriddleus.com
Mobile 50
Desktop —
Anthem Classic
anthemclassic.com
Mobile 51
Desktop 59
CARAVAN OUTPOST
caravanoutpostojai.com
Mobile 56
Desktop 64
Pedicure Bowls
pedicurebowls.com
Mobile 67
Desktop 92
The White Oak
thewhiteoak.be
Mobile 70
Desktop 94
Rutland County Garden Furniture
rutlandcountygardenfurniture.co.uk
Mobile 61
Desktop 84
Sajada
sajada.com
Mobile 81
Desktop 99
Mitchellwool
mitchellwool.com
Mobile 39
Desktop 54

Platform ranking and satisfaction

Position among all Shopify themes
#989 of 1302
Position among Shopify themes for "shoes"
#29 of 36
Overall satisfaction based on all reviews
100% positive

Tracked over time

Shopify themes ranking

Position among all Shopify themes

#989
10 positions
Sep 11 Sep 26 Sep 29 Oct 1 Oct 4 Oct 7
improved from #999 to #989 since Sep 11, 2026

Industry ranking

Position among Shoes industry

#29
position
Sep 11 Sep 26 Sep 29 Oct 1 Oct 4 Oct 7
No ranking change since Sep 11, 2026

Review growth

Cumulative merchant reviews

8
reviews
Sep 11 Sep 26 Sep 29 Oct 1 Oct 4 Oct 7
No new reviews since Sep 11, 2026

Price history

Theme Store list price, USD

$260
no price changes
Sep 11 Sep 26 Sep 29 Oct 1 Oct 4 Oct 7
No price changes since Sep 11, 2026

Release history

LATEST VERSION
v1.5.0
Released September 1, 2026
Releases in 12 mo 6
Total releases 12
First release August 25, 2025
v1.5.0 FEATURE

This update introduces a custom line item properties block to Product pages and the Featured product section, giving you more options to capture personalized details. It also enhances overall visual consistency with refined checkmark styling, while resolving issues with social icons hidden in the footer and missing cart progress bar colors on certain presets.

Added

  • Custom line item properties block to Product pages and Featured product section

Fixes and other improvements

  • Fixed social icons not showing in footer if branding text not set.
  • Fixed cart progress bar color not showing on some presets when not set.
  • Improved theme checkmark visiblity and style.
v1.4.1 FIX

This updates fixes an issue where the Shop the look mobile hotspots were displaying the wrong product on click.

Added

  • Fix Shop the look mobile hotspot product visibility.
v1.4.0 FEATURE

This update introduces additional layout control for the Logos grid and includes small refinements to improve the appearance and consistency of the Product quiz results.

Added

  • Added grid spacing controls to the Logos grid section

Fixes and other improvements

  • Fixed issue with Product quiz result layout when image was in right orientation.
  • Improved Product quiz layout spacing and button sizing.
v1.3.0 FEATURE

This update introduces new sections for product quizzes and video content, adds a product tag block to product pages, and includes a new blog tag glossary to improve content organization and discovery on blog pages.

Added

  • Added new Product quiz section.
  • Added new Video section.
  • Added new Video with text section.
  • Added new tag block to Product details section on Product pages.
  • Added blog tag glossary feature for categorizing blog posts.
v1.2.1 FIX

This hotfix resolves a UI issue affecting product image interactions, ensuring swatches no longer interfere with clicking the main product images.

Fixes and other improvements

  • Fixed a bug where product image swatches intercepted clicks that should have gone to the primary product images.

Full changelog

12 releases
Loading releases…

What merchants say about Platform Shopify theme

We know about 8 reviews

We purchased the Haven Shopify theme and had Kelsey from Hex Switch Family customise a few things for us. The theme itself is great, very easy to navigate and has most of the settings we needed. Kelsey was happy to add the customisations we wanted and got them done really promptly. Highly recommend!

T
THRIVEAU
Aug 25, 2026

Clean, well-designed theme with an intuitive UI that’s easy to work with. Handles dynamic data and metafields really well, making flexible layouts much easier to build. Great balance between customisation and simplicity. Kelsey, the developer, has been excellent, quick to respond and very helpful with code changes. Whether you’re working with complex data or keeping things simple, it just works.

R
Rutland County Garden Furniture
Apr 22, 2026

Beautiful Theme and excellent service. If i need anything a little more personal or something that i would think fits my stores style a bit better kelsey fixes it for me! Would recommend to anyone who is considering buying!

P
PALSPOSTER
Jan 21, 2026

Haven is an exceptionally well-designed theme with a clean, modern, and professional look. It offers a complete set of flexible controls while remaining easy to use. What I appreciate most is that it achieves excellent loading speed without sacrificing visual quality. In addition, the after-sales support has been outstanding. Kelsey is extremely responsive, proactive, and patient, providing clear

K
koova
Dec 17, 2025

I couldn’t be happier with this Shopify theme! It’s incredibly easy to use and very intuitive, even for someone who isn’t a tech expert. Everything works smoothly. What truly sets this theme apart is the Kelseys support. Response time is lightning fast. It’s rare to find such dedicated and friendly assistance these days, and it made the whole experience stress-free. Highly recommended!

R
Rare Oil Lamps
Dec 5, 2025

Hands down one of the best themes I've ever worked with out of the 20+ I've been through as a website designer for small brands. Excellent customization options, great sections, a well-thought out layout, and customer service from the developer Kelsey that is superior to any I've ever experienced. I could not recommend it more.

C
CARAVAN OUTPOST
Oct 13, 2025

Alternatives to Platform for Shoes industry

Lilt

Lilt

★ 100% · 8 reviews
$ 360,00